Free project scheduler · No sign-up

Plan, schedule and track EPC projects in your browser

Build the WBS, link activities, find the critical path, estimate man-hours from norms and measure weighted progress with S-curves. Built for planners and project controls in oil & gas, energy and construction.

Free to use. Nothing to install. Your schedules stay on your device unless you sign in to save them.

Planline schedule view: WBS table with durations, dates and links next to a Gantt chart with dependency arrows, critical path and progress
Free no account or licence
Private data stays in your browser
P6 and MS Project .xer and XML import
Excel report with Gantt and dashboard

Everything a planner needs, nothing to install

Planline sits between expensive licences like Primavera P6 and generic task boards that do not understand quantities, man-hours or weighted progress.

WBS and activities

Unlimited levels with summary roll-ups and WBS codes. Type, paste from Excel or import.

Logic and critical path

FS, SS, FF and SF links with lead or lag, working calendar, holidays, total float.

Man-hour estimating

Quantity × norm × productivity factor, from 397 editable norms or your own.

Weighted progress

Record quantities by day, week or month. Weightage comes from man-hours.

Dashboard and S-curves

KPI tiles, planned vs actual S-curve, man-hour histogram and a chart builder.

Import and export

P6 .xer, MS Project XML, Excel and CSV in. Excel report, CSV and MS Project XML out.

Made for oil & gas, energy and construction

Progress on EPC work is measured in inch-dia welded, tonnes erected and metres of cable pulled, not ticked boxes. Planline works the way project controls teams do: quantities drive earned man-hours, man-hours drive weightage, and weightage gives a true overall percent complete.

  • 397 indicative man-hour norms, 253 of them for oil & gas EPCM: civil & foundations, cross-country pipelines, electrical, fireproofing, instrumentation & control, insulation, mechanical equipment, painting & coating, piping erection and more
  • Rules of credit by quantity, recorded day by day, week by week or month by month
  • Baseline, schedule lock and planned vs actual S-curves for the monthly report

Browse the man-hour norms · How weighted progress works

Planline dashboard with KPI tiles, planned versus actual S-curve and man-hour histogram

Up and running in three steps

  1. Start or import. Begin with a blank project, paste rows from Excel, or import a P6 .xer or MS Project XML file.
  2. Plan. Add durations, links, quantities and norms. Dates, critical path and man-hours update as you type.
  3. Track and report. Record progress, watch the S-curve and export an Excel report for the weekly meeting.

Open the scheduler

Frequently asked questions

Is Planline really free?

Yes. There is no trial, licence or account. The site may show ads to cover its costs.

Where are my schedules saved?

In your own browser on your own device. Nothing is uploaded unless you choose to sign in with your email or Google account, which saves your projects to your account so they open on any device. Use Export › Project backup to keep your own copy.

Can I open Primavera P6 and MS Project files?

Yes. Import a P6 .xer file or an MS Project XML file. Native .mpp files must first be saved as XML from MS Project or the free ProjectLibre.

Does it work on a phone?

It works in any modern browser. A laptop or tablet is more comfortable for editing a schedule; a phone is fine for checking progress.

Who is it for?

Planners, project controls engineers, package and site engineers, subcontractors and students working on EPC, EPCM, oil and gas, energy and construction projects.

Your next schedule, ready in minutes

Free, private and built for project controls.

Open the scheduler