Planning and scheduling
Build a schedule that holds up: scope, WBS, logic, critical path and short-term planning.
Critical path method explained
Learn the critical path method: forward and backward pass, early and late dates, total float, and FS, SS, FF, SF links with lag. Then calculate the critical path of your own schedule free online.
How to build a project schedule, step by step
A practical, step-by-step method for building a construction or EPC project schedule: scope and WBS, activities, durations from quantities, logic, calendars, critical path review, baseline, and a 14-point quality checklist.
Work breakdown structure for EPC projects
How to build a work breakdown structure for an EPC or EPCM project: the 100% rule, phase-first versus area-first layouts, coding, how deep to go, and a full example for a gas plant expansion.
How to make a three-week look-ahead schedule
What a three-week look-ahead schedule is, how to build one from the master schedule, how to check constraints before work starts, and how to measure the plan with percent plan complete (PPC).
Progress and project control
Measure physical progress objectively and forecast where the project will land.
Weighted progress measurement and S-curves for EPC projects
How to measure physical progress on EPC and EPCM projects: weightage from man-hours, earned man-hours, quantity-based percent complete, weighted overall progress and planned vs actual S-curves, with a worked example.
Earned value management explained
Earned value management in plain language: planned value, earned value, actual cost, schedule and cost variance, SPI, CPI, EAC, ETC and TCPI, with a worked example in man-hours for a construction project.
Rules of credit for progress measurement
What rules of credit are and how to use them to measure construction and engineering progress, with example credit steps for civil, structural steel, piping, equipment, electrical, instrumentation and engineering deliverables.
Estimating man-hours
Turn quantities into man-hours, crews and durations.
Man-hour norms for construction and EPCM estimating
397 indicative man-hour norms (MH per unit) for oil and gas EPCM, engineering, power, buildings and general construction: welding, piping, steel, equipment, cable, instruments, insulation, painting and more.
How to estimate piping man-hours
Estimate piping installation man-hours step by step: take-off from isometrics, inch-dia and metres, weld, erection, valve, support and test norms, productivity factors, and a worked example with crew and duration.
Free tools and file formats
Make Gantt charts and open Primavera P6 and MS Project files without a licence.
Free EPCM scheduling software that runs in your browser
A free online scheduler for EPC and EPCM projects: WBS, critical path, Gantt chart, man-hour norms, quantity-based progress, weightage, S-curves, and P6 / MS Project import.
Free online Gantt chart maker
Make a Gantt chart online for free: tasks, sub-tasks, dependencies, critical path, baseline and progress bars, then export to Excel or MS Project. No account needed.
Open a Primavera P6 .xer file without P6
Open and view a Primavera P6 .xer file without a P6 licence. See the WBS, activities, relationships, critical path and Gantt chart, then export to Excel or MS Project XML.
View MS Project schedules without MS Project
Open MS Project schedules without MS Project: import an MS Project XML file to see tasks, links, critical path and Gantt chart in your browser, and export to Excel.